The coating of the O6 water pipeline, in South Africa, is nearing its completion. The last part of the O6 pipeline is currently being coated with Bituguard material, at Group 5 Pipe facilities in Meyerton, South Africa. It is being coated with the full range of the high quality Phoenix International Bituguard products, supplied and manufactured according to EN 10.300. The O6 is a 84″ pipe line, with a length of 18.6 km.